Every 10 years Control of lesions appearance in the structural elements.

To renew

Every 3 years Repainting of accessible metal parts of the structure.

Falla

Over time it is possible that some kind of detectable falla appears from the bottom of the roof. If any of the following symptoms is recommended that you consult your Builder or Architect.

List of symptoms of injury with potential impact on the structure:

– Deformations: bulges in ceilings, floor tiles disjointed, doors or windows that do not fit.

– Fissures and cracks: ceilings, floors, beams, doors, balconies and windows.

– Chipped in the lining of the structure.

– Rust stains on elements in the structure

– Rust stains on metals. .

Use

Like the rest of the building, the roof has its own structure with limited resistance to the use for which it is designed.

Modifications

Whenever you want to change the use of the cover (especially in flat roofs) should consult your Builder or Architect.

Falla

Over time it is possible that some kind of detectable lesion appears from the bottom of the cover, although in many cases this will not be visible. It should therefore respect the deadlines for review of the different elements. If any of the following symptoms is recommended that you consult your Builder or Architect.

FACADE

INSTRUCTIONS

The walls separating the habitable rooms of the building from the outside environment, therefore must meet high demands of insulation against cold or heat, noise, on the facade is the external image of the craft and its occupants.

The formation of the curtain walls can be very complex, being necessary for personal maintenance specialist.

FACADE

INSTRUCTIONS

The finishes of the facade are usually one of the weakest points of the ship as they are in direct contact with the elements. On the other hand, it may initially be just dirt or degradation of the aesthetic image of the facade can become dangerous because any release would fall directly on the street.

Over time, the paint is often discolor or stain by dripping rainwater. If you want to repaint, should be done with the same type of paint.

Ask your Builder or Architect the possibility of applying a colorless protective product.

OPERATIONS TO PERFORM

To Inspect

Every 5 years Inspection of the metal clamping

Facade.

Every 10 years General inspection of finished facade.

Clean Up

Every 10 years Cleaning the brickwork of the facade.

A Renew

Every 3 years Repainting of paint plastic facade.

Every 15 years Re-coating resins of the facade.

COBER

INSTRUCTIONS

The covers should be kept clean. Whenever possible, do not step on sloping roofs. When transiting through them must be very careful not to cause damage.

The sloping roofs will be accessible for maintenance only. The staff in charge of work shall be provided with safety belt shall be subject to service or two hooks fixed points of the cover. It is recommended that workers wear soft shoes with non-slip soles. Not travel on the decks when wet.

If new antennas, air conditioning or, in general, devices that need to be fixed are installed on the deck, the clamping cannot affect the waterproofing. Or be used as anchor points tensor, masts and the like, metal railings or work, or exit ducts of existing smoke, unless authorized by a qualified technician. If these new facilities need regular maintenance, it must in the event that the humidity in the floors below deck are observed, these humidity should be monitored, as they may have a negative effect on the structural elements.

The moss and fungi are removed with a brush and if necessary apply a fungicide.

Repairs will be made always by removing the damaged order not to overload the structure part.

Efforts should be made, whenever possible, do not walk above the non-trafficable flat roofs.When necessary step on it you must be very careful not to cause damage.

The inspection staff, servicing or repair shall be provided with soft-soled shoes.

To Renew

Review of fastening parts.

(Every 6 months)

Replacement of plate as specified. (Every 10 years)

BUILDING INTERIORS

INSTRUCTIONS

WALLS AND CEILINGS

The inner linings, like all the components, have a limited duration. Often exposed to abrasive wear, friction and shock.

They are materials that need more maintenance and must be replaced with a certain frequency. For this reason it is recommended to keep a certain amount of used materials to correct defects and in anticipation of minor reforms.

In general, the abrasive elements contact with the coating surface will be avoided. Cleaning will also be done with no abrasives.

When anomalies are not attributable to the use coatings are observed, talk to your Builder or Architect. Damage caused by water will be repaired immediately.

Often the defects in the linings are due to other defects

...