FRANK’S INTERNATIONAL PERU S.R.L
Enviado por karlo • 30 de Enero de 2018 • 1.415 Palabras (6 Páginas) • 399 Visitas
...
SEGURIDAD
NO
ITEM
METODOLOGIA
PERSONA/S RESPONSABLE
TO BE COMPLETED BY
1
Installation of Fire Alarm Pull Station/Air Horn and strobe lights in workshop
An assessment of the workshop was conducted by a series of contractors. Country Manager to determine what would be best suited to raise an alarm in that area in the event of an emergency.
External Contractor – Candice Howard to follow up
July 30th 2016
2
Conduct Emergency Drills
Emergency Drills would be conducted according to schedule (6/yr) to keep employees familiar with the ERP for different emergency situations. Drills would include: Fire Drills, Earthquake Drills, Hurricane Drills, Oil Spill Drills, Bomb Threat Drills, and Medical Emergency Drills.
Candice Howard, Seeta Birju-Singh, Triston Yarde.
Ongoing
3
Fire Warden Training refresher
Internal review of roles and responsibilities for Fire Wardens.
Candice Howard
March 30th 2016
4
Conduct monthly inspection of critical safety equipment
All critical safety equipment must be inspected on a monthly basis. Inspections would be carried out by the QHSE Coordinator and the Safety Wardens for the building. Safety Equipment includes: Smoke Detectors, Fire Extinguishers, Emergency Lights, First Aid Kits, Nylon Slings, Ladders, Spill Kit, Eye Wash Stations
Candice Howard, Tristan Yarde, Seeta Birju-Singh
Ongoing
5
Conduct monthly facility inspections
Supervisors, Managers and the QHSE Coordinator would be responsible for conducting monthly inspections of the facility. The inspections would be divided where supervisors would be required to complete one inspection the first week of the month, managers one inspection in the second week of the month and QHSE the third week of the month
Candice Howard, Noel Bailey, York McCauley, Sharon Mohammed, Marlon Oliver, Jason Dwarica, David Daniel
Ongoing
6
Maintain zero (0) tolerance on accident/incident in the workplace
This would be done by continuous toolbox/safety meeting to impart the QHSE knowledge to prevent accidents/incidents and will be measured by statistical analysis based on our accident reports which would be communicated through HSE reports.
All employees
Ongoing process
7
Encourage the continuous reporting of near misses
This would be done by continuous toolbox/safety meeting to impart the QHSE knowledge to prevent accidents/incidents and will be measured by statistical analysis based on our accident reports and would be communicated through HSE reports
Candice Howard, Noel Bailey, York McCauley
Ongoing
MEDIO AMBIENTE
NO
ITEM
METODOLOGIA
PERSONA/S RESPONSABLE
TO BE COMPLETED BY
1
Address action items identified by last Environmental Audit (2015)
Look at the findings from the last Environmental Audit conducted and put measures in place to close the gaps identified.
Candice Howard & York McCauley
February 29th 2016
2
To conduct an Environmental Audit
To contract an external party to an conduct an internal Environmental Audit on FI EMS
Sharmila Maharaj – Candice Howard to follow up
November 30th 2016
3
Construct Containment area for the diesel and hydraulic oil storage barrel.
A containment area for the hydraulic oil storage tanks and the diesel tank would be constructed to protect the environment in the event on a spill
Candice Howard to follow up
March 30th 2016
4
Monitor waste management system
Look at ways of reducing waste from the operations process
Triston Yarde and Candice Howard
Ongoing
5
Sensitization session with the Environmental Management Authority (EMA)
Session is aimed at sensitizing employees on the Environmental Management Authority as well as managing and protecting the environment.
EMA – Candice Howard to follow up
May 30th 2016
6
Monitoring of the catchment pit
The catchment is to be monitored to determine an established time frame in which it should be emptied.
Candice
...